Every contract delivered on time or ahead of schedule, backed by a 100% incident-free safety record, zero punchlist items on the majority of our closeouts, and a Very Good, Exceptional, or Outstanding rating on every completed project.
Design-build remediation of contaminated subsurface soil using in-situ thermal technology (Smart Burners™) across 40+ wells spanning a quarter-mile — performed inside an occupied small-business warehouse.
New-construction pre-engineered maintenance facility with an overhead bridge crane and fall-protection system — completed on schedule while absorbing nearly 70 weather-delay days to close out before funds expired.
Interior renovation and reconfiguration to create a new flight-simulator suite — MEP systems, fire alarm and PA, an aluminum storefront, motorized roller shades, and TATE raised access flooring.
Design-build replacement of ten high-volume vehicle exhaust systems throughout an active, occupied facility — a specialized ventilation scope spanning mechanical, electrical, architectural, and structural work.
Design-build remediation of contaminated subsurface soil using in-situ thermal technology across 40+ wells, inside an occupied warehouse.
New-construction pre-engineered maintenance facility with an overhead bridge crane — completed on schedule through ~70 weather-delay days.
Interior reconfiguration for a new simulator suite — MEP systems, aluminum storefront, and TATE raised access flooring.
Design-build replacement of ten high-volume vehicle exhaust systems in an active, occupied facility — mechanical, electrical, and structural.
Full restroom renovation plus a new lactation room and ADA features — completed in an occupied building with temporary facilities maintained throughout.
13,500 SF of EPDM re-roofing across five dispersed, occupied buildings under a strict fall-protection plan.
Interior renovation with new HVAC and underground electrical service — delivered 38 days early with zero punchlist.
In-kind replacement of 2,500 LF of welded underground LNG piping adjacent to an active airfield.
7,500 SF of EPDM re-roofing across three occupied buildings, including gutters, flashing, and fascia.
Decommissioned a 6,000-gallon underground tank and installed four new gravity-fed day tanks serving the building's fire pumps — phased, with hazmat testing.
A quarter-mile of new ADA-compliant concrete sidewalks, ramps, and tactile warning mats on an active military base.
2,300°F-rated stainless-steel liner replacement on an active flight line — completed 45 days early with zero punchlist.
Demolition and disposal of five modular buildings (30,495 SF), recycling nearly 75% of debris — completed roughly three months early.
Removal and disposal of a 6,000-gallon double-walled underground fuel tank with full OCC closure compliance.
Five new aluminum monument signs with CMU bases and waterproofing — completed more than two months early with zero punchlist.
Removal and disposal of a 3,000-gallon double-walled underground fuel tank with OCC closure compliance.
Removal and disposal of a 1,000-gallon double-walled underground fuel tank adjacent to an active airfield.