Selected Work

Proof, not promises.

Every contract delivered on time or ahead of schedule, backed by a 100% incident-free safety record, zero punchlist items on the majority of our closeouts, and a Very Good, Exceptional, or Outstanding rating on every completed project.

$16M+
In contracts awarded since 2022
18
Federal contracts awarded
5 agencies
FAA, EPA, Tinker AFB, Vance AFB, OK ANG
42.7 days
Average ahead of schedule
Featured Projects

Projects that show our range.

$4.82M
EPA · Region 7 · Valley Park, MO

Valley Park TCE Remediation

Design-build remediation of contaminated subsurface soil using in-situ thermal technology (Smart Burners™) across 40+ wells spanning a quarter-mile — performed inside an occupied small-business warehouse.

Design-BuildEnvironmentalOccupied SiteOutstanding CPARS
$3.64M
FAA · Mike Monroney Center

Mobile System Test Bed

New-construction pre-engineered maintenance facility with an overhead bridge crane and fall-protection system — completed on schedule while absorbing nearly 70 weather-delay days to close out before funds expired.

New ConstructionOutstanding PPQ
$1.29M
FAA · Mike Monroney Center

CAI Room B50 Simulators

Interior renovation and reconfiguration to create a new flight-simulator suite — MEP systems, fire alarm and PA, an aluminum storefront, motorized roller shades, and TATE raised access flooring.

RenovationOutstanding PPQ
$1.11M
Tinker AFB

Vehicle Exhaust Systems, B1130

Design-build replacement of ten high-volume vehicle exhaust systems throughout an active, occupied facility — a specialized ventilation scope spanning mechanical, electrical, architectural, and structural work.

Design-BuildVentilationOccupied Facility
Full Portfolio

A record across five federal and public agencies.

$4.82MEPA · Region 7

Valley Park TCE Remediation

Design-build remediation of contaminated subsurface soil using in-situ thermal technology across 40+ wells, inside an occupied warehouse.

Design-BuildEnvironmentalOutstanding CPARS
$3.64MFAA · MMAC

Mobile System Test Bed

New-construction pre-engineered maintenance facility with an overhead bridge crane — completed on schedule through ~70 weather-delay days.

New ConstructionOutstanding PPQ
$1.29MFAA · MMAC

CAI Room B50 Simulators

Interior reconfiguration for a new simulator suite — MEP systems, aluminum storefront, and TATE raised access flooring.

RenovationOutstanding PPQ
$1.11MTinker AFB

Vehicle Exhaust Systems, B1130

Design-build replacement of ten high-volume vehicle exhaust systems in an active, occupied facility — mechanical, electrical, and structural.

Design-BuildOccupied Facility
$1.03MTinker AFB

Restrooms & Lactation Room, B1055

Full restroom renovation plus a new lactation room and ADA features — completed in an occupied building with temporary facilities maintained throughout.

RenovationADA
$916KTinker AFB

Repair Multiple Roofs

13,500 SF of EPDM re-roofing across five dispersed, occupied buildings under a strict fall-protection plan.

Roofing5 Buildings30+ Days Early
$775KTinker AFB

Design-Build HVAC, B5914

Interior renovation with new HVAC and underground electrical service — delivered 38 days early with zero punchlist.

Design-Build38 Days EarlyOutstanding PPQ
$684KVance AFB

Aircraft Fire Training Facility

In-kind replacement of 2,500 LF of welded underground LNG piping adjacent to an active airfield.

Underground Utility43 Days Early
$409KTinker AFB

Replace Roofs

7,500 SF of EPDM re-roofing across three occupied buildings, including gutters, flashing, and fascia.

Roofing3 Buildings30+ Days Early
$394KTinker AFB

Replace Vault Fuel Tank, B1032

Decommissioned a 6,000-gallon underground tank and installed four new gravity-fed day tanks serving the building's fire pumps — phased, with hazmat testing.

Fuel SystemsHazmat
$128KOK Air National Guard

Construction of Sidewalks

A quarter-mile of new ADA-compliant concrete sidewalks, ramps, and tactile warning mats on an active military base.

CivilOutstanding PPQ
$92KVance AFB

Ceiling Liner, F992 Burn House

2,300°F-rated stainless-steel liner replacement on an active flight line — completed 45 days early with zero punchlist.

Envelope45 Days EarlyZero Punchlist
$84KFAA · MMAC

MB5 Demolish Buildings

Demolition and disposal of five modular buildings (30,495 SF), recycling nearly 75% of debris — completed roughly three months early.

Demolition~3 Months Early
$67KVance AFB

Remove Fuel Tank, F500

Removal and disposal of a 6,000-gallon double-walled underground fuel tank with full OCC closure compliance.

Fuel SystemsCompleted EarlyZero Punchlist
$66KFAA · MMAC

Refurbish Building Signs

Five new aluminum monument signs with CMU bases and waterproofing — completed more than two months early with zero punchlist.

Site Work2+ Months EarlyZero Punchlist
$58KVance AFB

Remove Fuel Tank, F155

Removal and disposal of a 3,000-gallon double-walled underground fuel tank with OCC closure compliance.

Fuel SystemsCompleted EarlyZero Punchlist
$28KVance AFB

Remove Fuel Tank, F197

Removal and disposal of a 1,000-gallon double-walled underground fuel tank adjacent to an active airfield.

Fuel SystemsOutstanding PPQCompleted EarlyZero Punchlist